RAM-TECH Engineers, Inc.
2 International Plaza

Suite 243
Philadelphia, Pennsylvania 19113
Tel: 610-521-5159
Fax: 610-521-6562

Raman & Borick
Technical Services, Inc.

6100 Fairway Drive
P.O. Box 10
Syracuse, New York 13211
Tel: 315-463-7716
Fax: 315-463-7758
                                               

 

Applied Technology Center
Onondaga Community College

 

Syracuse, New York


Complete Design/Build Services Mechanical/Electrical and Specialty Systems

 

 

 

 

 

 

 

 

ONONDAGA COMMUNITY COLLEGE, Syracuse, NY

. Applied Technology Center
Facilities Survey and Design of the mechanical/electrical system for the new state-of-the-art, Applied Technology Center. Included is the design of HVAC, plumbing, fire protection, communication (voice & data), public address, security, alarm and power (primary & secondary) systems.

. Service & Maintenance Building
Modifications of HVAC system at the Service & Maintenance Building to improve the indoor air quality and room space temperature control.

. Academic & Maintenance Building
Modifications of HVAC system at the Service & Maintenance Building to improve the indoor air quality and room space temperature control.

. Day Care Center
Installation of a new central humidification system to serve the Day Care Center.

 

SUNY Upstate Medical University

Syracuse, New York


 

 

 

SUNY UPSTATE MEDICAL UNIVERSITY, Syracuse, NY

. Renovations to Jacobsen Hall
RAM-TECH was the prime consultant for the complete architectural, structural, mechanical and electrical engineering design for fire safety and ADA compliance improvements for this existing 10 story dormitory, which has been converted to office space. Included code compliance report and renovations including asbestos abatement, new fire service and sprinkler/standpipe system with fire pump, new fire alarm system with voice evacuation capabilities, new electric service, new emergency generator, elevator upgrades and other miscellaneous fire safety issues including stairwell improvements, egress door modifications and handicapped toilet rooms, etc.

. Regional Oncology Center Renovation
Currently working on first floor and second floor addition and complete renovation of the Regional Oncology Center in a phased manner to maintain medical treatment to patients during construction. Includes new HVAC, electrical, plumbing and fire protection services. New generator and outdoor site utility services will also be provided.

. Upgrade Electrical Infrastructure – Campus Activities Building

RAM-TECH was the prime consultant for the engineering design for electrical distribution system improvements for the Campus Activities Building.

. Computer Warehouse Building – Second Floor Alterations
Complete renovation and conversion of second floor storage space into offices for the Department of Urology and other administrative personnel. Included complete new HVAC systems, plumbing and fire protection systems, lighting, power, fire alarm and security systems while other floors above and below remain occupied and in operation. Also involved rehabilitation to existing elevator to create a stop at the second floor.

. Gross Anatomy Lab – Weiskotten Hall
Currently under construction is complete renovation of basement floor Gross Anatomy Lab. Includes all new HVAC, plumbing, fire protection, electrical and communications systems. Includes state-of-the-art dissecting spaces with refrigerated coolers and support spaces, offices, etc. Existing 4-story building will remain operational throughout duration of construction.

Cheyney University,  Cheyney, PA

Provided mechanical and electrical design to increase campus security  and provide open architecture environmental controls across the campus.  All systems will connected together via the campus’s Ethernet LAN.  Security systems include, CCTV, Motion detection, electric gates.   Upgraded the HVAC systems in three buildings, including the replacement of roof top units, addition of exhaust and makeup air systems, and replacement on packaged terminal air conditioning units. 

STATE UNIVERSITY OF NEW YORK COLLEGE AT CORTLAND, Cortland, NY

. Fuel Dispensing Station
Removal and replacement of an existing underground 2,000 gallon diesel tank at Service Group Building No. 33. Included double wall suction lines, fire suppression, leak detection system, fuel monitoring and alarm systems, and fuel island dispensing pumps.

. Building Rehabilitation - Clark Hall and Higgins Hall
Renovation of two ten-story dormitories/residence halls which include fully addressable fire alarm systems, modifications to the emergency power systems, new card control entry system, new ventilation systems, modifications to summer hot water system and other miscellaneous electrical, plumbing and HVAC work relating to conversation of dwelling units to apartment type suites.

. Miller Administration Building –First Floor Rehabilitation
Renovation of first floor admissions offices which included asbestos abatement, new ventilation systems, and modifications to existing plumbing, electrical, fire alarm and communications systems. New toilet rooms, offices, conference rooms, admission spaces, reception area and mechanical rooms were provided. The area was designed with an “up-scale” appearance to attract admission candidates.

. Sperry Learning Resource Center
Currently working on the complete and total renovation of an existing classroom and lecture hall building including new site utilities, electrical, plumbing and HVAC systems. The building is to be fully sprinklered and provided with an emergency generator for standby power.

SUNY COLLEGE OF ENVIRONMENTAL SCIENCE & FORESTRY, Syracuse, NY

. Replacement of Main Electrical Feeders
Replacement of the cabling associated with the existing 4,160 volt electrical distribution system on the College's main Syracuse Campus and provide standby generator power while the work was taking place.

. Marshall Hall
As the initial stage of a multi-phase project, the existing mechanical and electrical systems at Marshall Hall were surveyed and assessed as to their general condition and compliance with codes. A program study was developed.

STATE UNIVERSITY COLLEGE AT PLATTSBURGH, Plattsburgh, NY

Involved complete structural rehabilitation for safety of an exterior pedestrian walkway, plaza and podium. The project included the design of new high intensity discharge lighting systems to meet I.E.S lighting recommendations, a heat trace system for exposed storm drainage systems and the provision of a dry pipe fire protection system for a storage area.


STATE UNIVERSITY COLLEGE AT ONEONTA, Oneonta, NY

. Complete mechanical/electrical design relating to the replacement of a 180 ton screw-type chiller, including modification to an existing cooling tower.

STATE UNIVERSITY OF NEW YORK AT OSWEGO, Oswego, NY

. Fire Safety Improvements
Campus-wide rehabilitation project involving a dozen or more buildings at the SUNY Oswego campus to improve fire safety violations. The project included both alterations and the provision of new fire protection systems, fire alarm systems and HVAC system renovations and additions.

. Rehabilitation of Park Hall
Involved the rehabilitation of a large classroom/auditorium and provision of new lighting and communications systems and other mechanical/electrical modifications.


. Site Lighting Improvements
Involved major improvements to the exterior site and security lighting to I.E.S. recommended lighting levels throughout the campus for increased safety.

. Laker Hall - Replace bleachers/Refinish Floor
RAM-TECH was the prime consultant for the removal of existing bleachers and patching of existing hardwood flooring and refinishing of hardwood floors. Included the installation of a new telescoping bleacher system and replacing existing lighting system, related electrical work, repainting of interior walls, doors, trim and exposed structure.

. Lakeside Dining Hall Asbestos Removal
RAM-TECH was the prime consultant for asbestos removal in the basement Mechanical room of Lakeside Dining Hall. Work included removal and replacement of equipment, ductwork, tanks, etc. to gain access to all areas covered with spray-on asbestos. All tanks and pipe were insulated.

 

SYRACUSE UNIVERSITY, Syracuse, NY

. Evaluation of Sound and Illumination Pollution
Performed an intensive study and prepared a detailed sound system and lighting system analysis and report of the Manley Athletic Complex, as it relates to the residences along Lancaster Avenue. Neighbors complained of noise and light pollution to their properties; RAM-TECH identified the sources of problems and recommendations were made to remedy the situation.

. Modifications and Additions to Link Auditorium
Involved major improvements to existing Auditorium lighting, dimming and audio visual systems, as well as miscellaneous electrical and HVAC modifications.

. Parking Garage Renovations
Performed a mechanical/electrical obsolescence and code compliance study of the Brewster/Boland Garage, the Irving Garage, the Booth Garage and the Lawrinson Garage at Syracuse University. Included in the study was a review of the standpipe/sprinkler systems, drainage systems, ventilation systems, lighting and power systems. Conclusions and recommendations, together with opinions of probable construction cost were arrived at.

Performed a follow-up, more detailed lighting study to verify compliance with City of Syracuse General Ordinance 29 relative to Security for Parking Garages which became effective on 8/1/95. Services included a detailed report outlining our findings, including recommendations and opinion of probable construction cost. Study was followed up by preparation of construction documents to improve lighting system sin stairwells of all four garages to City of Syracuse Parking Garage Ordinance and recommendations of the Illuminating Engineering Society of North America.

ADIRONDACK COMMUNITY COLLEGE, Glens Falls, NY

Renovation to the Science Building, which is two stories and approximately 22,000 square feet in area. The scope included provision of a chiller, with room fan coil unit air conditioning system, ventilation air system, and associated electrical and plumbing systems. Included is the addition of laboratory hoods and upgrading of laboratory furniture and equipment.
 

ITHACA COLLEGE, Ithaca, NY

Renovations to mechanical and electrical systems to convert an existing building to an art department, complete with woodworking and metal shops, print shop, lithography/silkscreen rooms and sculpture. Included revisions to the heating and ventilating systems and upgrade of the plumbing and electrical systems.

 