|

RAM-TECH Engineers
of Syracuse, P.C.
6100 Fairway Drive
P.O. Box 10
Syracuse, New York 13211
Tel: 315-463-7716
Fax: 315-463-7758
RAM-TECH Engineers
of Buffalo, P.C.
2495 Main Street
Suite 435
Buffalo, New York 14214
Tel: 716-833-7716
Fax: 716-832-6373
RAM-TECH Engineers, Inc.
2 International Plaza
Suite 243
Philadelphia, Pennsylvania 19113
Tel: 610-521-5159
Fax: 610-521-6562
Raman & Borick
Technical Services, Inc.
6100 Fairway Drive
P.O. Box 10
Syracuse, New York 13211
Tel: 315-463-7716
Fax: 315-463-7758
| |
RAM-TECH Engineers' personnel have extensive
experience in providing professional investigative and design services for
correctional facilities. Our personnel, in their professional careers, were the
lead engineers in the design of prisons such as Mohawk Correctional Facility,
Oneida Correctional Facility, Midstate Correctional Facility, Greene
Correctional Facility, Coxsackie Correctional Facility and Eastern Correctional
Facility.
Services include heating, ventilating, and air conditioning systems, plumbing,
and fire protection systems, lighting and power systems, fire alarm, sound,
security, standby generation systems, high/medium voltage systems and other
special systems.
Projects that RAM-TECH Engineers has recently completed include the following:
State Correctional Institution, Camp
Hill, PA
Provided plumbing design to replace all domestic cold and hot galvanized water
piping from the main service throughout 4 cellblocks and the kitchen/dinning
facility. Provided plumbing design to replace all sanitary piping from each
fixture to the existing main lateral.
CLINTON CORRECTIONAL FACILITY, Dannemora, New York
Complete investigation of the Facility's primary power distribution and steam
distribution systems. Provided twenty year Master Plan Analysis including
upgrading Facility voltage, cogeneration potential utilizing high pressure steam
to power steam turbine generator, with exhaust steam utilized in low pressure
loop steam distribution upgrade to accommodate current and future maximum
security Facility growth. Design of Phase One Improvements including power and
steam distribution systems upgrade, and new fire protection and standpipe
system.
Rehabilitate several cell blocks and renovate the primary distribution system,
including new underground ductbank and rightofway permit applications.
MOHAWK CORRECTIONAL FACILITY, Rome, New York
Complete design of underground power and communication system and the expansion
of the electrical normal and emergency power distribution systems for entire
campus of the Mohawk Correctional Facility, which is composed of approximately
20 buildings.

Coxsackie Correctional Facility
Coxsackie, New York
Mechanical/Electrical and Special Systems Design for New Medical Facility
New York
State Office of General Services
Albany, New York
COXSACKIE C.F. MEDICAL FACILITY, Coxsackie, NY
Design and
construction administration for a new state-of-the-art medical facility to house
AIDS/TB patients. A significant part of the facility included specialized
pressurized isolation rooms to prevent transmission of air borne pathogens.
Project also included special systems such as Nurse Call, Fire Alarm, Medical
Gases, Paging, Security including CCTV, etc. The HVAC system included a
complete redundant system with the ability to perform normal maintenance and
filter changes without shut downs. Temperature and humidity control was a major
factor due to the conditions of the patients. The emergency power system
included diesel engine generator with complete load transfer systems. Fire
protection system included a complete hydraulically calculated sprinkler and
stand pipe systems with associated fire pump and accessories.
REGIONAL LONG TERM CARE HOSPITAL, Rome,
New York
Renovation of Building #52 at Mohawk Correctional Facility to Long Term Care
Facility. Unit included a 36 bed rehabilitation unit, outpatient clinic, 27 bed
pre-post hospitalization unit, and support services. The project involved
complete mechanical/electrical systems upgrade, including heating, ventilating
and air conditioning systems, plumbing, medical gas and fire protection systems,
lighting, power emergency generator systems, nurse call, fire alarm, security
and communications system.
CAPE VINCENT, OGDENSBURG & RIVERVIEW CORRECTIONAL FACILITIES
Design of Isolation Room Set-ups, exceeding CDC Guidelines, for T.B. patients.
ANNUAL WATER QUALITY SURVEY, ALL DCS FACILITIES
Water Quality Survey of all Department of Correctional Services Facilities in
the State of New York fed from Municipal water source. This undertaking was
completed in less than six weeks.
MT. McGREGOR CORRECTIONAL FACILITY
Mechanical and electrical engineering services for a new kitchen building. The
building is approximately 6000 sq. ft.

Other Correctional Facility projects our
personnel were involved as lead engineers in their professional career, are as
follows:
MIDSTATE CORRECTIONAL FACILITY, Marcy, New York
Mechanical and Electrical design of Projects M0584 and M0629 including the
design of New Visitor's Center and Service Garage as well as renovation to
convert several existing buildings to secure housing units for inmates.
ONEIDA CORRECTIONAL FACILITY, Rome, New York
Mechanical and Electrical design of Projects M0862, M0865 and M0863. Included
the design of a new Recreation Building and the complete mechanical/electrical
renovations of over 14 buildings on the Former Rome Developmental Center site to
a State Medium Security Prison.
MOHAWK CORRECTIONAL FACILITY, Rome, New York
Electrical design of Buildings 54 and 56 (Project M0965). Included the complete
design of power distribution systems, lighting and power systems, fire alarm and
sound/intercom systems for an inmate and activities building.
EASTERN CORRECTIONAL FACILITY, Napanoch, New York
Design of new primary care health facility including mechanical and electrical
systems. Project included systems design for fire protection, elevators, fuel
systems and standby emergency generation.
|