Hospitals
 

RAM-TECH Engineers
of Syracuse, P.C.

6100 Fairway Drive
P.O. Box 10
Syracuse, New York 13211
Tel: 315-463-7716
Fax: 315-463-7758

RAM-TECH Engineers
of Buffalo, P.C.

2495 Main Street
Suite 435
Buffalo, New York 14214
Tel: 716-833-7716
Fax: 716-832-6373

RAM-TECH Engineers, Inc.
2 International Plaza

Suite 243
Philadelphia, Pennsylvania 19113
Tel: 610-521-5159
Fax: 610-521-6562

Raman & Borick
Technical Services, Inc.

6100 Fairway Drive
P.O. Box 10
Syracuse, New York 13211
Tel: 315-463-7716
Fax: 315-463-7758
                                               

 

RAM-TECH Engineers' personnel have many years of experience in providing professional design services for hospital & health care facilities.

The Firm of RAM-TECH Engineers has provided mechanical/electrical and related design services for many facilities. Some of representative facilities include:

. Geisinger Medical Facility, Wilkes-Barre, PA

. St. Joseph's Hospital Health Center - Syracuse, NY
. SUNY Upstate Medical University - Syracuse, NY

. Norristown State Hospital,   Norristown, PA
. SUNY Downstate Medical University - New York, NY
. Crouse-Irving Memorial Hospital - Syracuse, NY
. Veterans Administration Medical Center - Syracuse and Canandaigua, NY
. Van Duyn Home & Hospital - Syracuse, NY
. Regional Long Term Care Hospital - Rome, NY
. Coxsackie and Eastern Correctional Facilities, Medical Facilities - West Coxsackie and Napanoch, NY
. Saratoga Hospital - Saratoga, NY
. Loretto Nursing Home - Syracuse, NY
. Monroe Community Hospital - Rochester, NY
. Lewis County Hospital - Lowville, NY
. Community Memorial Hospital - Hamilton, NY
. Oswego Hospital - Oswego, NY
. Seneca Hill Health Services Center - Oswego, NY
. St. Elizabeth Hospital - Utica, NY
. St. Francis Hospital - Poughkeepsie, NY

Services include heating, ventilating and air conditioning systems, plumbing and medical gas systems, fire protection systems, lighting systems, power and emergency stand-by systems, fire alarm systems, nurse call systems, sound systems and security systems.

The following is a brief narrative of several projects for which RAM-TECH Engineers has provided design services:


Geisinger Medical Facility,
Wilkes-Barre, PA

RAM-TECH was a consultant to the lead Architect and was responsible for a MEP/FP site infrastructure survey and master plan for the future Emergency Room Addition, Physician Office Building and Parking Garage.  The master plan recommendations included upgrading the main 12,470-volt electrical service, additional generators to support the increased emergency requirements, additional boilers and chillers were included as well as an additional fire pump.  

REGIONAL LONG TERM CARE HOSPITAL, Rome, NY

Complete renovation of Building #52 at Mohawk Correctional Facility to Long Term Care Facility. Unit shall include a 36 bed rehabilitation unit, outpatient clinic, 27 bed pre-post hospitalization unit, and support services. Involved complete mechanical/ electrical systems upgrade, including plumbing, medical gas and fire protection systems, heating, ventilating and air-conditioning systems, lighting, power, underground fuel tank, leak detection system, emergency generator systems, nurse call, fire alarm, security and communications system. Air systems were 100% outside air with heat recovery wheels. Isolation room air systems were designed to make the spaces positive or negative in relationship to adjacent spaces.
 


St. Joseph's Hospital Health Center

 

Syracuse, New York

 

 

 

 

 

 

 

 

ST. JOSEPH'S HOSPITAL HEALTH CENTER, Syracuse, NY

 

. Pediatrics Clinic
Complete mechanical/electrical design for converting existing 2nd floor space to pediatrics clinic. Included extension of existing power systems, new lighting and nurse call systems and extension of the existing fire alarm system. Also included the removal and replacement of existing air and water systems.

. Hemodialysis Unit
Complete mechanical/electrical design for a major addition and renovations to the existing hemodialysis clinic. Included new electrical service with diesel﷓driven emergency generator with above ground fuel tank and leak detection system, and sized to provide standby power for the entire facility. Included new lighting and power systems for over a dozen hemodialysis stations, nurse call systems and extension of the existing fire alarm systems, plumbing and sprinkler systems, plus cable television and sound system. Also included complete new HVAC systems. Because of tight building constraints, air systems were mounted adjacent to the building on steel grillage.

. Dental Clinic
Complete mechanical/electrical design of relocated dental clinic from the Hospital to the 7th floor of the Physician's Office Building. Included provision of new pressure booster pumps, vacuum pumps and compressors for medical gases, new lighting and power systems and extension of existing HVAC systems for the six-chair dental suite, X-ray, laboratory and other support rooms.

. CPEP Unit
Complete mechanical/electrical design involving the conversion of an existing Convent to the Comprehensive Psychiatric Emergency Program (CPEP) Unit, one of only six similar facilities in existence in the United States. Included the provision of new sprinkler service, heating, ventilating and air conditioning systems, as well as new lighting, power and communications systems. All systems had to meet hospital and office of mental health standards.

. GYN/Women's Services
Complete mechanical/electrical redesign of the existing fourth floor of Building 7 involving the conversion of an existing pediatrics unit to Women’s Services. Included the provision of new sprinkler and HVAC services and special lighting systems, along with nurse call, fire alarm and power and communications systems.

. Acute Kidney Unit
Complete mechanical/electrical renovation of an existing space to house a dialysis unit with purified water systems, new HVAC, plumbing, fire protection, electrical and communications systems, including fire alarm and nurse call systems. Involved substantial renovation of sub-basement mechanical and electrical infrastructure.

. Cardiology and Same Day Recovery
Complete mechanical/electrical design involving the conversion of a patient wing into a Cardiology unit with special procedure rooms and a 38 - bed same day recovery suite. Involved extensive upgrade of existing HVAC systems, including new rooftop and penthouse air handling units which were ducted down the outside of the existing structure to the 2nd floor ceiling space. Also included were upgrades of the emergency power electrical systems, fire protection system, fire alarm system and medical gas and plumbing systems.

. 973 James Street
Complete renovation of the first and second floor of an existing office building to accommodate dialysis and clinical space for outpatient treatment. Included new HVAC systems, plumbing systems, fire protection system, electrical, communication and fire alarm systems. It also included new sanitary service, outdoor site lighting and a remote outdoor generator for emergency power.
 


 

 

 

 

 

 

 

SUNY UPSTATE MEDICAL UNIVERSITY, Syracuse, NY

. Gross Anatomy Building Addition and Renovations
Complete mechanical/electrical design for a major addition and renovations to the existing gross anatomy lab. Included replacement of electrical service for the associated wing. Included new lighting and power systems for 40 teaching stations, and extension of the existing fire alarm systems, plumbing and sprinkler systems. Also included complete new HVAC systems. Specialized exhaust system was installed to mitigate formaldehyde vapors, this system included heat recovery to maximize energy efficiency.

. Regional Oncology Center Addition and Renovations
Complete mechanical/electrical design for a major addition and renovations to the existing oncology center. Included new electrical service with diesel-driven emergency generator with above ground fuel tank and leak detection system. Included new lighting and power systems, nurse call systems and extension of the existing fire alarm systems, plumbing and sprinkler systems for 14 infusion stations, blood lab, pharmacy and support offices. Also included complete new HVAC systems.

. Automate “A-B” Switchgear – East Wing
Design an automatic switching scheme, to automatically open either main 5000 amp 480 volt breaker and close the 5000 amp 480 volt tie breaker upon the loss of power on one side of the double ended switchgear for the East Wing of the Hospital. The control system automatically returns the system to its normal state when power is restored.

. Renovations to Jacobsen Hall
RAM-TECH was the prime consultant for the complete architectural, structural, mechanical and electrical engineering design for fire safety and ADA compliance improvements for this existing 10-story dormitory, which has been converted to office space. Code compliance report including asbestos abatement, new fire service and sprinkler/standpipe system with 60 HP fire pump, new fire alarm system with voice evacuation capabilities, new electric service, new 150 kW emergency generator, elevator upgrades and other miscellaneous fire safety issues including stairwell improvements, egress door modifications and handicapped toilet rooms, etc.

. Urology Clinic & Offices
RAM-TECH was the prime consultant for the complete architectural, structural, asbestos abatement and mechanical/electrical engineering design for the conversion of an existing open office space to a Urology Clinic and Offices. Included replacement of existing one-story roof and related asbestos abatement, miscellaneous interior partition, wall and ceiling removals and renovations, new room finishes and accessories, new roof opening and steel reinforcement for HVAC unit, provision of new air distribution systems, reusing one existing rooftop unit and provision of one new unit, provision of new plumbing fixtures and relocated domestic water systems, sanitary, waste and vent systems and new lighting and power systems and extension of existing communications and special systems.

. UPS Installation
Complete coordination of the installation of a new UPS system to a computer facility, including complete structural analysis and reinforcement of floor slab, plus review of HVAC and electrical requirements to accommodate same.

. Ambulatory In-Service
Complete renovation of the HVAC systems in former first floor office space into ambulatory in-service function with patient examination areas. Included the design of a 15 ton split system air conditioning system.

. Emergency Power Systems
RAM﷓-TECH provided complete architectural and engineering services required for the complete investigation, report and construction documents in providing permanently installed emergency power generation systems for the Campus Activities Building and the Computer Warehouse Building. RAM-TECH determined that an existing 100 kW generator could be utilized for the CAB Building, while a new 250 kW unit was required for the Computer Warehouse Building. Both generators were located remote from the buildings in architecturally designed, site fabricated buildings to match the existing building architecture.

. Radiation Oncology Dosimetry
Complete electrical and HVAC design to convert former basement Linear Accelerator Room into computer space, with hub and file server equipment, UPS and related scanners, etc. Included extension of existing HVAC system and new lighting, power and communications systems.

. 1 West Moves, Phlebotomy
Complete HVAC, plumbing and electrical design for relocated department in first floor west. Included HVAC and plumbing alterations to existing systems, new lighting, power and communications systems.

. Weiskotten Hall Anatomy Labs
Complete HVAC, plumbing and electrical design for Anatomy Department Laboratories comprised of existing Rooms 1139, 1141 an 1142 without shutdown of adjoining spaces. Included new laboratory counters and casework, fume hoods, air handling systems, exhaust systems, electrical panelboards and medical gases.

. SUNY Upstate Term Contract
Upgrade Electrical Infrastructure - Campus Activities Building
Weiskotten Hall Addition Emergency Transfer Switches
Emergency Generator - Clark Hall
Non Acute Short Stay Unit
Computer Warehouse Building Computer Room Upgrade
UH1 West Moves (Clinical Research Lab Room 6709)
4 North Peds Intermediate Care
Automate East Wing Substation "A" and "B" Tie Breakers

. Miscellaneous Studies & Services

Campus Activities Building Electrical Usage Study
Main Electrical Service Shutdown Consultation
Investigation of Grounding in West Wing
Code Review & Analysis - Adapt the Second Floor of the CWB to Office "Swing" Space
Repairs to South Basement Utility Room
Fan Guard Survey and Design
Weiskotten Hall Rooms 1166 and 1201
7 North Neurology Floor Renovations
Regional Oncology Center (ROC) Feasibility Study
Cardiopulmonary Renovations on 8 North

Norristown State Hospital,   Norristown, PA

   

 RAM-TECH was the prime consultant for the complete architectural, mechanical and electrical design for the installation of a perimeter security fence; renovations to the patient ventilation and installation of air conditioning in untreated spaces.  The security fence included man and vehicle access; cut, climb and tamper detection, CCTV coverage.  The heating ventilation and air conditioning systems included new chillers and new ventilation coils in the existing air handling units and 4 pipe fan coil units for room conditioning.  Fan coil units were arranged in a vertically stacked arrangement and included steel floor to ceiling suicide resistant security enclosures in patient rooms.  Electrical systems included service extensions of the campus medium voltage distribution and security station monitoring and alarm system upgrades.  Budget constraints and minimum disruption to the patient daily routines and construction phasing in the occupied facility were the critical design criteria identified and addressed. 

CROUSE IRVING MEMORIAL HOSPITAL, Syracuse, NY

. Radiology
Site preparation, including lighting, special systems (nurse call, code blue), power including X-ray equipment power, raceway and cabling. HVAC modifications of a dual duct system.

. Echocardiography
Office renovation for the expansion of the echocardiography unit. Renovation consisted of all electrical lighting, power, special systems and video cabling. Plumbing work consisted of designing sprinkler and new sinks for the examination rooms.


 

V.A. Medical Center

 

Canandaigua, New York

 

HVAC Modifications to Buildings 3, 9 and 33

 

 

 

 

V.A. MEDICAL CENTER, Canandaigua, NY
 

This project included the incorporation of air conditioning into the upper two floors of three buildings at the V.A. Medical Center in Canandaigua, New York. RAM-TECH was responsible for the entire project. The scope of work follows:

General Construction work included construction to incorporate the HVAC system changes into the existing buildings and replacement of the ceilings throughout the upper two floors of each building. The construction of chases containing vertical duct, piping and conduit risers was also included.

Electrical work included new electric service to each building to serve the new HVAC equipment. New lighting was provided throughout the upper two floors of each building. Fire protection work included relocation of the existing sprinkler heads where ceilings were lowered to accommodate ductwork. The HVAC work consisted of the following: Heating System: Replacement of existing radiant ceiling panels where present and connection to the existing heating hot water supply and return piping. Where steam heating existed, the existing steam heating system was replaced with a new hot water heating system. Hot water supply and return piping from a steam-to-hot water converter located in the basement to hot water radiant ceiling panels throughout the building was included. VAV air conditioning systems were incorporated to provide required cooling ventilation and supplemental heating to the upper two floors of each building. Chilled water pumps and supply and return piping from the chiller to the air handling units in the attic was also included. Ventilation System: The existing toilet exhaust ventilation was removed and a new combined toilet and general exhaust system sized to provide the required air change rates ducted from each space to exhaust fans located in the attic was included. A new DDC temperature control system was included to control the HVAC systems included in this project.
 

SARATOGA HOSPITAL MATERNITY SUITE, Saratoga Springs, NY

Complete mechanical/electrical renovation to existing maternity suite. Included rework and extension of existing HVAC systems, extension of existing plumbing and fire protection systems, medical gas systems, new lighting and power systems, nurse call systems and extension of existing fire alarm systems.

SENECA HILLS HEALTH SERVICES CENTER, Oswego, NY

Complete mechanical/electrical design of new, single story 18,000 sf ambulatory care facility associated with Oswego Hospital. Included multiple tenant spaces with dental suites and other treatment areas including a linear accelerator room, simulator room, x-ray rooms and associated control areas. The HVAC system is comprised of multiple above-ceiling horizontal furnaces with remote air-cooled condensing units and a central makeup air unit. There are multiple gas and electrical meters for various tenants along with special power condition equipment, medical gases, etc.

VAN DUYN HOME AND HOSPITAL, Syracuse, NY

. Fire Alarm System
RAM-TECH was the prime consultant in the provision of a new addressable fire alarm system for the addition of smoke detection to each of the 324 patient rooms and all necessary connections to the existing system. Also includes the replacement of existing fire alarm and monitoring system at each of the four complex buildings and necessary tie to Fire Control Headquarters.

. Security System
RAM-TECH was also the prime consultant in the design and construction administration for a new security system which included over 36 indoor color and outdoor black/white cameras, patient wandering system, door hardware, card-key access and central monitoring station.
 

NEW MEDICAL FACILITY, COXSACKIE CORRECTIONAL FACILITY, West Coxsackie, NY

Design of a new 80,000 s.f. medical facility including HVAC, plumbing, electrical, security communications and emergency generation systems. Also includes radiology, medical isolation rooms, outpatient clinics, etc.

ST. ELIZABETH MEDICAL CENTER, Utica, NY

. 3rd and 4th Floor Addition/Expansion
Includes ten operating rooms with associated holding and recovery areas, 16 Intensive Care Rooms, and Ambulatory Care Services (Endoscopy, Respiratory, Eye Laser, etc.). Also included was the replacement of the Central Hospital Heating And Cooling Plants, including three new 500 boiler horsepower steam boilers and two 500 ton centrifugal chillers and associated pumps and auxiliaries. In addition, the electric service to the Hospital was upgraded for the project.

. Radiology Renovations, First Floor
Design of two Radiology Rooms to house Neurostar and Polystar Radiographic Equipment.

. Other additional St. Elizabeth projects are as follows: 3rd Floor Renovations, Cardiac Catheterization Lab, Kitchen Cooler, Morgue, Women and Children’s Clinic and Building 2206 Renovations.

 